Amagerværket consists of three units, each equipped with boiler and turbine plant. Amagerværket supplies power for the electricity grid of the island of Zealand and heat for the district heating network of Copenhagen.
Amagerværket unit 1 and 2 Operationalized:
1971 and 1972 with 136 MW electricity /109 MW electricity and 190 MJ/s heat Coal and oil.
Amagerværket unit 3
Operationalized in 1989 with
250 MW electriticy / 215 MW electricity and 330 MJ/s.
The three units are equipped with electrical flue gas filters for collection of ash in the smoke. Last year the plant produced more than 11.000 tons of ash. The recycled ash is used in cement and concrete production.